ASAP stands for Accelerated SAP. Its purpose is to help design SAP implementation in the most efficient manner possible. Its goal is to effectively optimize time, people, quality and other resources, using a proven methodology to implementation. ASAP focuses on tools and training, wrapped up in a five-phase process oriented road map for guiding implementation.
The road map is composed of five well-known consecutive phases:
•        Phase 1 Project Preparation
•        Phase 2 Business Blueprint
•        Phase 3 Realization
•        Phase 4 Final Preparation
•        Phase 5 Go-Live and support
In today's post we will discuss the first phase.

ASAP Methodology  - Phase 1 : Project Preparation

Phase 1 initiates with a retrieval of information and resources. It is an important time to assemble the necessary components for the implementation. Some important milestones that need to be accomplished for phase 1 include
•        Obtaining senior-level management/stakeholder support
•        identifying clear project objectives
•        architect an efficient decision-making process
•        creating an environment suitable for change and re-engineering
•        building a qualified and capable project team.
Senior level management support:
One of the most important milestones with phase 1 of ASAP is the full agreement and cooperation of the important company decision-makers - key stake holders and others. Their backing and support is crucial for a successful implementation.
Clear project objectives:
Be concise in defining what your objectives and expectations are for this venture. Vague or unclear notions of what you hope to obtain with SAP will handicap the implementation process. Also make sure that your expectations are reasonable considering your company's resources. It is essential to have clearly defined ideas, goals and project plans devised before moving forward.
An efficient decision making process:
One obstacle that often stalls implementation is a poorly constructed decision-making process. Before embarking on this venture, individuals need to be clearly identified. Decide now who is responsible for different decisions along the way. From day one, the implementation decision makers and project leaders from each area must be aware of the onus placed on them to return good decisions quickly.
 Environment suitable for change and re engineering:
Your team must be willing to accept that, along with new SAP software, things are going to change, the business will change, and information technology enabling the business will change as well. By implementing SAP, you will essentially redesign your current practices to model more efficient or predefined best business practices as espoused by SAP. Resistance to this change will impede the progress of your implementation.

ASAP Methodology - Phase 2- Business Blueprint

SAP has defined a business blueprint phase to help extract pertinent information about your company that is necessary for implementation. These blueprints are in the form of questionnaires that are designed to probe for information that uncovers how your company does business. As such, they also serve to document the implementation.
Each business blueprint document essentially outlines your future business processes and business requirements. The kinds of questions asked are germane to the particular business function, as seen in the following sample questions:
1) What information do you capture on a purchase order?
2) What information is required to complete a purchase order?
Accelerated SAP question and answer database:
The question and answer database (QADB) is a simple although aging tool designed to facilitate the creation and maintenance of your business blueprint. This database stores the questions and the answers and serves as the heart of your blue print. Customers are provided with a customer input template for each application that collects the data. The question and answer format is standard across applications to facilitate easier use by the project team.
Issues database:
Another tool used in the blueprinting phase is the issues database. This database stores any open concerns and pending issues that relate to the implementation. Centrally storing this information assists in gathering and then managing issues to resolution, so that important matters do not fall through the cracks. You can then track the issues in database, assign them to team members, and update the database accordingly.

ASAP Methodology - Phase- 3 - Realization:

With the completion of the business in phase 2, "functional" experts are now ready to begin configuring SAP. The Realization phase is broken in to two parts.
1) Your SAP consulting team helps you configure your baseline system, called the baseline configuration.
2) Your implementation project team fine-tunes that system to meet all your business and process requirements as part of the fine tuning configuration.
The initial configuration completed during the base line configuration is based on the information that you provided in your blueprint document. The remaining approximately 20% of your configuration that was not tackled during the baseline configuration is completed during the fine tuning configuration. Fine tuning usually deals with the exceptions that are not covered in baseline configuration. This final bit of tweaking represents the work necessary to fit your special needs.
Configuration Testing:
With the help of your SAP consulting team, you segregate your business processes into cycles of related business flows. The cycles serve as independent units that enable you to test specific parts of the business process. You can also work through configuring the SAP implementation guide (IMG). A tool used to assist you in configuring your SAP system in a step by step manner.
Knowledge Transfer:
As the configuration phase comes to a close, it becomes necessary for the Project team to be self-sufficient in their knowledge of the configuration of your SAP system. Knowledge transfer to the configuration team tasked with system maintenance (that is, maintenance of the business processes after Go-live) needs to be completed at this time.In addition, the end users tasked with actually using the system for day-to-day business purposes must be trained.

ASAP Methodology - Phase 4 - Final Preparation:

As phase 3 merges into phase 4, you should find yourselves not only in the midst of SAP training, but also in the midst of rigorous functional and stress testing. Phase 4 also concentrates on the fine tuning of your configuration before Go-live and more importantly, the migration of data from your old system or systems to SAP.
Workload testing (including peak volume, daily load, and other forms of stress testing), and integration or functional testing are conducted to ensure the accuracy of your data and the stability of your SAP system. Because you should have begun testing back in phase 2, you do not have too far to go until Go-live. Now is an important time to perform preventative maintenance checks to ensure optimal performance at your SAP system.At the conclusion of phase 4, take time to plan and document a Go-live strategy. Preparation for Go-live means preparing for your end-users questions as they start actively working on the new SAP system.

ASAP Methodology - Phase 5 - Go-live and Support:

The Go-live milestone is itself is easy to achieve; a smooth and uneventful Go-live is another matter altogether. Preparation is the key, including attention to what-if scenarios related not only to the individual business processes deployed but also to the functioning of technology underpinning these business processes and preparation for ongoing support, including maintenance contracts and documented processes and procedures are essential.

No comments:

Labels

sap hana hana database aws s4 hana hana db s4hana conversion steps sap hana azure bw4hana hana migration s4hana migration sap cloud migration steps sap hana migration steps sap hana migration to azure s4hana sap fiori fiori performance fiori erp s4 hana fiori sap fiori app sap fiori client sap fiori launchpad sap s4 hana fiori cisco ecc AI SAP AI abap dumps hana sap S/4HANA S/4HANA Conversion best sap ui5 & fiori training configuration database fiori tutorial on webide free sap ui5 & fiori training s/4 hana sap dumps sap fiori tutorial sap ui5 sap ui5 & fiori sap ui5 & fiori tutorial sara ui5cn 2367245 - Troubleshooting performance issues with SAP BPA Amazon free tier for SAP AWS setup Experience CALL_FUNCTION_NOT_FOUND CCMS Configuration and Use Create New Data Class in SAP (Oracle) Critical top SAP Abap dumps DHCP Clients Not Receiving IP Addresses Download Stack.xml HAN-DB HAN-DB-ENG High CPU Usage Due to Excessive Process Switching How To How to Start and Stop SAP Hana Tenant Database How to change SAP Hana Sql Output results are limited to 5000 Records How to perform SAP Dual Stack Split - Netweaver Inactive Objects in SAP Intercompany transactions in SAP AP / AR : Cross Company Code Transaction Interface Flapping Due to Duplex Mismatch KBA LOAD_PROGRAM_LOST MSSQL shrinking transaction log file Migrating to SAP hana database NAT Overload Causing Internet Access Failure Note 500235 - Network Diagnosis with NIPING OSPF Adjacency Not Forming PRINCE2 Foundation Sample Questions Preparing for S/4HANA Conversion and the MUST know items Push to Download Basket S/4HANA Migration Cockpit S/4JANA SAP BI Support Data Load Errors and Solutions SAP BI/BW Landscape SAP BPA SAP Basis SAP Basis Automation SAP Business Objects SAP CPS SAP Certification SAP FI Certification SAP FI Certification Sample Questions SAP HANA Admin - Cockpit SAP HANA DB Engines SAP HANA Database SAP HANA terminate session connection disconnect cancel kill hang stuck SAP Hana DB restore SAP Hana Numeric Error Codes SAP Landscape SAP Language installation SAP MM and Purchase Order Tables SAP Maintenance Planner SAP Note 500235 SAP R/3 Glossary SAP Readiness Check SAP S/4HANA 1709 Installation Files SAP S/4HANA 2023 SAP S/4HANA 2023 Installation SAP S/4HANA 2023 running SAP S/4HANA Installation SAP Scheduling SAP Solman 7.2 CHARM: SAP Support Package Stack Strategy SAP Support package SAP Upgrade SAP support stack upgrade SP stacks STORAGE_PARAMETERS_WRONG_SET SUSE/SLES/Kernel versions Setup of S/4hana 2023 TSV_TNEW_PAGE_ALLOC_FAILED TSV_TNEW_PAGE_ALLOC_FAILED error Transaction ID Unable to download an SAP Note Unix/Linux Command That Are Helpful For SAP Basis Upgrading SAP Kernel Without Downtime Upgrading windows server 2008 to windows server 2019 What is OSS Notes? SAP SNOTE Tutorial accounting agile ale idoc ale/edi archive FI documents audit auditing auditor aws aws cloud basic type bluefield approach ccms ccmsidb charm copilot datavard dbacockpit download sap note download snote edi idoc electronic data interchange enable sap archiving objects erpprep ffid firefighter fraud functional hana admin how to apply sap security note https://www.erpprep.com/ idoc install install sap fiori installation interfaces intermediate document internal control license key linux version materials management messsage niping test order type port prince2 agile prince2 agile practitioner purchasing quick info s4 hana sap abap dumps sap abbreviations sap activate certification sap activate project manager sap authorization sap aws sap brownfield sap ccms sap ccms configuration sap erp sap error sap grc sap greenfield sap internet demo system sap license sap maintenance certificate sap material management sap meaning sap mm sap mm consultant sap monthly security note sap netweaver sap network diagnostic sap niping sap note sap oss sap patch day sap performance sap performance issue sap purchase order sap s/4hana sap sales and distribution sap sap otc sap sd sap sd certification training sap sd course sap sd jobs sap sd module sap sd online training sap sd training sap sd tutorial sap sd tutorial for beginners sap security sap security note sap snote sap snote tutorial sap solution manager sap sql segregation of duties separation of duties sles slicense smc snote snote in sap system sod conflict solution manager solution maneger stop start hana database suse linux techie trex two step upgrade required waterfall